Procurement organisation in project-based setting: a multiple case study of engineer-to-order companies


Journal article


Antonella Moretto, Andrea S. Patrucco, Helen Walker, Stefano Ronchi
Production Planning \& Control, vol. 33(9-10), Taylor \& Francis, 2022, pp. 847-862


View PDF
Cite

Cite

APA   Click to copy
Moretto, A., Patrucco, A. S., Walker, H., & Ronchi, S. (2022). Procurement organisation in project-based setting: a multiple case study of engineer-to-order companies. Production Planning \&Amp; Control, 33(9-10), 847–862. https://doi.org/10.1080/09537287.2020.1837938


Chicago/Turabian   Click to copy
Moretto, Antonella, Andrea S. Patrucco, Helen Walker, and Stefano Ronchi. “Procurement Organisation in Project-Based Setting: a Multiple Case Study of Engineer-to-Order Companies.” Production Planning \& Control 33, no. 9-10 (2022): 847–862.


MLA   Click to copy
Moretto, Antonella, et al. “Procurement Organisation in Project-Based Setting: a Multiple Case Study of Engineer-to-Order Companies.” Production Planning \&Amp; Control, vol. 33, no. 9-10, Taylor \& Francis, 2022, pp. 847–62, doi:10.1080/09537287.2020.1837938.


BibTeX   Click to copy

@article{moretto2022a,
  title = {Procurement organisation in project-based setting: a multiple case study of engineer-to-order companies},
  year = {2022},
  issue = {9-10},
  journal = {Production Planning \& Control},
  pages = {847-862},
  publisher = {Taylor \& Francis},
  volume = {33},
  doi = {10.1080/09537287.2020.1837938},
  author = {Moretto, Antonella and Patrucco, Andrea S. and Walker, Helen and Ronchi, Stefano}
}


Share

Tools
Translate to